About 16 weeks to go live. Six months down; the sheet does not state the later cadence, so payments after that are monthly. No separate spec.
All clusters
Reserve the cluster. Submitting does not start machines or charge you.
Delivery in Q1 2027. Viewing available. 20% down to start; a higher deposit may lower the rate. 8× B300 per node, liquid cooled.
About 8–12 weeks to go live. Viewing available. Both 3-year and 5-year terms are $5.346. 8× B300 SXM per node.
About 10–14 weeks to go live. The price cell reads 5.44.7: $5.40 for 3 years, $4.70 for 5 years. 8× B300 SXM per node.
About 12–16 weeks to go live. The price cell reads 5.44.7: $5.40 for 3 years, $4.70 for 5 years. 8× B300 SXM per node.
March 2027
Delivery in March 2027. 128 machines, 8× B300 HGX each, 1024 GPUs, partial orders accepted. Liquid cooled. Viewing in Dallas.
About 20 weeks to go live. 18 months down; the sheet does not state the later cadence, so payments after that are monthly. 8× B300 HGX per node, 1024 GPUs.
February 2027
Delivery in February 2027. Commercial row: B300, 60 machines, $5.10. The spec cell says 8× B200 SXM.
December 2026
Delivery in December 2026. 12 H200 NVL machines. The spec lists about 96 GPUs.
T+3 to go live. 50 GB300 machines. The spec describes NVL72 racks.
In stock
In stock. A test can be arranged after the contract is signed.
In stock
In stock, limited. HGX B300 NVL8 machines with 8 GPUs each, 28 machines and about 224 GPUs. Three-year or five-year term. 20% deposit at signing.
In stock
Gigabyte 3T. InfiniBand fabric. Five-year closed term. 128 machines already in the hall (in stock); 128 in transit. Deposit 12 months, pay 3 months. Signed with a strong entity (overseas dual-non, or a domestic entity).
January 2027
Delivery in January 2027. Phase 1 refits 32 nodes, expandable to 128–1024 nodes, 4 MW at the site.
December 2026
2.8 MW air-cooled. Delivery by the end of December 2026. The site has passed KYC. Five-year closed term. 30% prepaid; part of that prepayment can convert to equity, and an SPV is negotiable.
March 2027
Excludes tax. Delivery in March 2027 (5-month lead time). Prepaid first 4 months, then monthly from month 5. Deposit covers the last two months of rent.
January 2027
Delivery in January 2027. B300-SXM. 128 machines on futures, expandable. Other terms negotiable. Deposit one, pay one.
Computeify's own datacenter.
Air-cooled. A purchase order can be provided. Delivery in 3 months. Three-year closed term. Deposit one year, pay six months. Signed with a strong entity.
512 GB300 GPUs in total (128 machines, 4 GPUs each). One-year minimum term. Deposit one month, pay one month.